Oyu Tolgoi LLC (the ‘Company’) would like to invite potential and/or experienced suppliers to submit their Expression of Interest (EOI) in relation to supply of Supply of South Seepage solar pumping station engineering design and construction service.
[An EOI is only a preliminary step to a formal tender process to understand and identify whether there are potential suppliers in the market that are interested in and capable of satisfying the procurement needs]
Scope description:
The supplier is responsible for performing, but not limited to, the following tasks:
- Developing engineering designs
- Supplying equipment and materials
- Assembly work and installation of equipment for the solar pump station
- Conducting testing, calibration, and commissioning.
Interested and experienced suppliers are invited to submit their EOI and must include/attach, as a minimum, the following documentations / information:
Mandatory documents:
- State registration certificate (copy)*
- HSE policy & procedures (copy)*
- Business Code of Conduct (copy)*
- Audited Financial statement from last 3 years (copy)*
- Brief introduction of company (copy)*
- Ownership/ shareholder information such as Company charter (copy)*
- Executive team structure/ introduction (copy)*
- Organization structure & Total manpower (copy)*
* If latest copies are already uploaded in “Oyu” Supplier Database, please make a note in the submission document(s) and no need to re-submit.
Scope specific documents:
- Scope specific experience
- Customer reference (at least 2) if applicable
- Copy of relevant license or c
Any interested suppliers who wishes to participate in the EOI, must be registered in “Oyu” supplier database. If you have not registered in “Oyu” database, please register at https://oyu-supplierdatabase.ot.mn/.
EOI documents must be prepared in Mongolian and/or English and must be submitted via “Oyu” Supplier database before 5:00 PM (Ulaanbaatar time), 11 October 2024.
Important notice:
- The Company is only seeking Expression of Interest from potential suppliers and makes no representation or promise in relation to procuring work from a supplier or suppliers.
- The Company reserves the right to refuse any document(s) which is incomplete or submitted after the specified date & time.
- The Company will not accept any EOIs stored in internet storage or in any other webpages and links.
- The Company will not be responsible for any costs associated with preparing and submitting an Expression of Interest to the Company.
- There will be no Questions and Answers provided during the EOI process.
OYU TOLGOI LLC
PROCUREMENT DEPARTMENT