History

  • Stripping of the Southern Oyu deposits to prepare for open pit mining began in August 2011.
  • The first ore from Oyu Tolgoi was mined at the open pit in April 2012.
  • The open pit mine will eventually cover an area of 1.5×2.7 km and will be about 650 metres deep.