Oyu Tolgoi LLC (the ‘Company’) would like to invite all potential contractors to submit Expression of Interest for the Construction of the Central Heating Plant facility.

The contractor will expand the existing Central Heating Plant. The contract includes all site works associated with the expansion including but not limited to earthworks, civils, structural, mechanical installation, piping and electrical and instrumentation. All major equipment will be free issue but the contractor is expected to purchase bulk items such as steel, piping and cables. The expansion incorporates the installation of two 29MW coal fired boilers and associated equipment in a new steel fabricated boiler house. The existing fan house will be expanded to accommodate the new ID fans for the new boilers. A baghouse, limestone system and flue gas ducting will be installed as part of the contract. A new control system will be installed in the existing control room. For further details of the scope please refer to the attached document and drawings referred therein.

The potential suppliers must complete the Pre-Qualification Questionnaire as well as submit any of the requested supporting documentation.

The Company is only seeking Expression of Interest from potential suppliers and makes no representation or promise in relation to procuring work from a supplier or suppliers.

The Company stresses the importance of Mongolian participation in any contract(s) for this scope of work. To this end international contractors are encouraged to consider and provide details of the opportunities for participation by Mongolian contractors eg as joint venture partners, subconsultants or subcontractors. Similarly if Mongolian contractors do not believe that they have sufficient capability for a component of the scope eg elements of the design of the facility, Mongolian contractors should consider joint venturing with or engaging international contractors or consultants to provide the necessary support.

Please submit your proposal prepared in English and/or Mongolian via OTUGRFxBox@ot.mn, (subject: CW2099459 – Construction of Central Heating Plant) before 5pm, (Ulaanbaatar time) 27 October 2016. Only soft copy materials from the Interested Parties are acceptable.

If you have any related questions, please ask via OTUGRFxBox@ot.mn (subject: CW2099459 – Construction of Central Heating Plant) before 5pm, (Ulaanbaatar time) 20 October 2016

The Company reserves the right to refuse any document(s) which is incomplete or submitted after the specified date. The Company will not be responsible for any costs associated with preparing and submitting an Expression of Interest to the Company. The Company will contact only the candidates who are qualified / shortlisted for the further process.

It is required for interested parties to complete registration process at http://oyutolgoi.achillesapac.com/en/, if not registered in “Oyu Tolgoi” company’s Master Supplier Database.

Note: Jacobs Engineering Singapore Pte Ltd (Jacobs) has been engaged the Company to undertake services in connection with the Project including engineering and procurement of certain packages. Jacobs will be undertake the prequalification process on behalf of the Company.